Skip to workspace
MillFlow EdgeTracker

Workshop setup

Prepare a local EdgeTracker workshop.

Local workshop accessUse the setup commands in the repository README to create a workshop and start the local server.
  1. 1

    Create your workshop

    Open the configured local workshop and choose Manager or Operator.

    Local
  2. 2

    Organize your storage

    Add tape materials, a workstation and cabinets with matching slots.

    Local
  3. 3

    Complete a roll cycle

    Receive a roll, record its label code, find it, take it and confirm its return.

    Local
  4. 4

    Connect your equipment

    Join Wi-Fi, claim the controllers and check slot lighting.

    Planned

Internet and workshop Wi-Fi are required for normal operation.